2024 Summer Paving Projects
Funded thanks to Measure D

FY 2023/24 Pavement Rehabilitation Project
Scheduled to start late July and end in October.  
Scope includes:
• Mill and Hot Mix Asphalt Overlay of City streets
o Center Avenue from Redwood Drive to Glacier Drive
o Hidden Lakes Drive from Chilpancingo Parkway to Hidden Lakes Court
o Chilpancingo Parkway from City limit to Hidden Lakes Drive
o Morello Avenue east bound from Vine Hill Way to Chilpancingo Parkway
o Vine Hill Way from Morello Avenue to Center Avenue
o Granite Court
o Morello Court
o Olympic Drive west of Glacier Drive
• ADA curb ramps
• Buffered bike lanes along Morello and Chilpancingo
MCK Services, Inc. was awarded the construction contract. 
 
FY 2023/24 Surface Seal Project
Scheduled to start late August and end in November.
Scope includes:
• Cape Seal of City streets
o Center Avenue from Morello Avenue to 900’ north of Rolling Hill Way
o Elderwood Drive from Rolling Hill Way to Center Avenue
o Endriss Drive from Elderwood Drive to Redwood Drive
o Martindale Drive from Redwood Drive to Endriss Drive
o Redwood Drive from Center Avenue to Martindale Drive
o Silverwood Drive from Center Avenue to Redwood Drive
o Flintwood Court
o Benedict Court 
o Cromart Court
o Huntridge Court
o Kentfield Court
o McMillan Court
o Radcliffe Court

Slurry Seal of City streets
o Dale Road from Paradise Drive to Rolling Hill Way
o Diablo Way from Rolling Hill Way to Paradise Drive
o Paradise Drive from Rolling Hill  Way to Vine Hill Way
o Vine Hill Way from Muir Road to Rolling Hill Way
o Diablo Court
o Gatewood Court
o Myrtlewood Court
o Sweetwater Drive from Muir Road to Muir Road
o Alps Court
o Blackrock Place
o Boulder Creek Court
o Drycreek Court
o East Peak Court
o Eastview Place
o Freshwater Court
o Highcliff Court
o North Peak Place
o Range Place
o Rangeview Place
o Redrock Place
o Rock Pass Place
o Southwest Court
o Stillcreek Court
o Stillspring Place
o Westward Place
o Rainier Drive from Center Avenue to Olympic Drive
o Rainier Court
o Augustine Drive from Jays Place to Macalvey Drive
o Colton Place
o Chilpancingo Parkway from Morello Avenue to Hidden Lakes Drive

Microsurfacing of City streets
o Morello Avenue from Muir Road to Vine Hill Way
o Morello Avenue west bound from Vine Hill Way to Chilpancingo Parkway
o Minaret Drive from Center Avenue to end
o Jays Place from Morello Avenue to Augustine Drive
o Jeanne Circle

2022/2023 Surface Seal Project

2022/2023 Surface Seal Project Map

Construction Notification Letter

 Photo 1

The 2022/2023 Surface Seal Project, funded by Measure D, includes rubberized cape seals and slurry seals as well as base repairs, curb ramp improvements, curb and gutter repairs, and new pavement striping and markings. 

A Rubberized Cape Seal is a two step process consisting of a rubberized chip seal and a slurry seal.  A rubberized chip seal involves the spreading of small diameter (< 1/2") rock with asphalt binder that includes rubber in the emulsion. The rubber holds the rock better than asphalt binder only and also prevents smaller cracks from reflecting through.

The second phase of a cape seal is a slurry seal (sand and asphalt binder), applied approximately two weeks later, that provides a smooth ride and black finish color. 

Certain streets will only receive the slurry seal due to the pavement condition. 

Construction Schedule (June - July 2023)

  • Curb ramps, sidewalk, curb and gutter - June 1st - June 20th
  • Striping removal, crack sealing - June 19th - June 27th
  • Chip seals - June 27th
  • Slurry Seals - July 10th - July 13th
  • Pavement striping - July 17th - July 26th
  • General work hours - 8am - 5pm

Rubberized Cape Seal Streets:

Photo 2 Photo 3

 

  • Heavenly Drive
  • Heavenly Place
  • Milano Way from Arnold Drive to La Veranda Place
  • Providence Drive
  • St. Moritz Avenue
  • St. Moritz Way
  • Sunnyslopes Drive

 Slurry Seal Streets:

Photo 4 Photo 5

  • Banbury Court
  • Banbury Loop
  • Bridgeport Way
  • Country Run Drive
  • Forsythia Drive
  • Forsythia Way
  • Menesini Place
  • Milano Way from La Veranda Place to Banbury Loop
  • Norwalk Court
  • Provincetown Court
  • Saybrook Place
  • Westaire Boulevard

The 2022/2023 Surface Seal Project is possible due to Measure D, the Martinez Road Improvement and Maintenance Measure.  Measure D is a one-half percent (0.50%) transactions and use (sales) tax, passed in 2016, which provides funding exclusively for Martinez road improvement and maintenance needs.

More information regarding Measure D can be found at:  https://www.cityofmartinez.org/government/measures/measure-d